Contact Legal Notices |  

COPYRIGHT © 2018 ZHONGYE CHANGTIAN INTERNATIONAL ENGINEERING CO., LTD All Rights Reserved 300.cn 湘ICP备17007661号-1   湘公网安备43010402000565号 300.cn

 

NEWS

>
>
Assisting Binxin Steel to Achieve Ultra-Low Emission Class-A Enterprise!

News

Assisting Binxin Steel to Achieve Ultra-Low Emission Class-A Enterprise!

2024/03/18

Recently, two ultra-low emission technical renovation projects— "3#, 4# Sintering Hot Air Circulation" and "Sealed Unloading Cars for 1# and 2# Blast Furnace Bunkers"—undertaken by CIE as the EPC Contractor for Jiangsu Binxin Steel Group Co., Ltd. (hereinafter referred to as "Binxin Steel"), were successfully put into operation and passed acceptance. This milestone marks a significant step towards Binxin Steel's goal of becoming an ultra-low emission Class-A enterprise.

 

 

The 3# and 4# Sintering Hot Air Circulation project employs CIE's self-developed dynamic hot air circulation technology. It fully utilizes both the sensible and latent heat in the sintering waste gas, achieving nearly zero emissions from the ring cooler's waste gas, while also reducing the solid fuel consumption in sintering and easing the subsequent desulfurization and denitrification pressures.

 

 

The Sealed Unloading Cars for 1# and 2# Blast Furnace Bunkers project adopts mobile dust source capture technology. It systematically optimizes the air volume of the dedusting pipeline network for the blast furnace bunkers by capturing dust from all collection points through a mobile ventilation duct, without increasing the total dedusting air volume, thus meeting the ultra-low emission assessment criteria.

Search