Contact Legal Notices |  

COPYRIGHT © 2018 ZHONGYE CHANGTIAN INTERNATIONAL ENGINEERING CO., LTD All Rights Reserved 300.cn 湘ICP备17007661号-1   湘公网安备43010402000565号 300.cn

 

NEWS

>
>
CIEE Won the Bid for the EPC of Solid Waste Disposal Center Safety Landfill Site Project (Phase III) in Jiangxi Province

News

CIEE Won the Bid for the EPC of Solid Waste Disposal Center Safety Landfill Site Project (Phase III) in Jiangxi Province

2022/06/13

On June 8, CIEE, a subsidiary of CIE, won the bid for the EPC of Solid Waste Disposal Center Safety Landfill Site Project (Phase III) in Jiangxi Province. This was another in-depth cooperation between CIEE and DJE (Dongjiang Environment) following the hazardous waste disposal project in Jieyang and industrial solid waste disposal project in Mianyang.

 

 

In Phase I and Phase II, the storage areas of the project were designed and constructed according to the Standard for Pollution Control on the Hazardous Waste Landfill (GB 18598-2001), while in Phase III, the Standard for Pollution Control on the Hazardous Waste Landfill (GB 18598-2019) was followed. Two standards were adopted for the design and construction in different zones at the same landfill site, which has created a precedent for the safety landfill site project of hazardous waste in China.

Search