Contact Legal Notices |  

COPYRIGHT © 2018 ZHONGYE CHANGTIAN INTERNATIONAL ENGINEERING CO., LTD All Rights Reserved 300.cn 湘ICP备17007661号-1   湘公网安备43010402000565号 300.cn

 

NEWS

>
>
ZENITH’s project of 580㎡ ring cooler system and waste heat power generation transformation went into operation

News

ZENITH’s project of 580㎡ ring cooler system and waste heat power generation transformation went into operation

2019/05/24
Designed by CIE, ZENITH’s project of 580㎡ ring cooler system and waste heat power generation and transformation went into operation at 0:00 AM on May 23.
The project used the ring cooler of reversible discharging designed and independently developed by CIE itself. The project featured high loading coefficient and large ventilation area with full-plane trolley structure, while it adopted flat seal, which improved the gap leakage problem when the ring cooler slips and effectively enhanced cooling efficiency. Its top adopted full seal cover structure, which effectively perfected on-site operating environment and increased waste heat recovery utilization. 
 
Search