Contact Legal Notices |  

COPYRIGHT © 2018 ZHONGYE CHANGTIAN INTERNATIONAL ENGINEERING CO., LTD All Rights Reserved 300.cn 湘ICP备17007661号-1   湘公网安备43010402000565号 300.cn

 

NEWS

>
>
>
Pangang Group presents CIE with an ink-stone

News

Pangang Group presents CIE with an ink-stone

2011/01/12

On Jan 10, the general manager of Pangang Group Co. Ltd, Yu Zishu and his party visited CIE and presented CIE with an inkstone carved with “Congratulations to CIE on its brilliant achievements The No.2 new sinter machine project of Pansteel undertaken by CIE creates the world record in terms of construction period”, giving thanks to CIE for their contributions in technical reconstruction of sintering system of ironmaking plant of Pangang Group Panzhihua Steel and Vanadium Co., Ltd. At the presentation ceremony, on behalf of the company, the president of CIE Yi Shuguang accepted the inkstone souvenir presented by Pansteel.

Yu Zisu expressed that, it is a miracle for the general contractor CIE to build the No.2 new sinter machine successfully only in nine months, and a new record in history of same scale sinter machine construction was built. He also said that, “the startup of the project ahead of time fully shows that CIE not only has excellent design capacity and general contracting capability, it also has ability for hard work”. Yu Zisu introduced the present development condition of Pansteel to CIE, putting forward specific requirements for construction of such EPC projects as Baima concentration, Xichang sintering and Panchengsteel sintering etc. which are in cooperation by two parties, hoping both parties to strengthen cooperation in desulphurization and waste heat generation fields on the basis of existing cooperation.

 

Search